The swing bridge at the harbour entrance to Bathurst Basin will be closed for one week from Monday 20th to Saturday 25th May. We understand that the existing wooden plank pathway over the bridge is being lifted, removed and replaced with new sub floor supports and a new top light grey colour cover platform made of GRP (Glass Reinforced Plastic) covered in a non-slip aluminium oxide. The bridge structure will then be painted.